top of page
PURLIFT LATEST
CASE STUDIES


Case Study - École Boileau
Project: Lift, level, and stabilize a concrete slab of approximately 1,730 square feet. Installer: Purlift Inc. Engineering Firm: CIMA Plus Architectural Firm: Rubin Rotman Associés Challenge École Boileau faced significant structural issues due to floor settlement in two classrooms and a supply room. The floors had settled by approximately four inches, caused by the decomposition of organic matter beneath the structure. This resulted in a void of about two inches be
Gus Masoud
Feb 131 min read


Case Study - Police Station
Project: 6,300 square foot police station with adjacent public security office and fire station had sunk up to three inches. Installer: PURLIFT INC. Challenge: The building was built in an area where there was a hill sloping away from the structure approximately 20 meters away. A number of factors had contributed to the slab having sunk, including one or more of the following: The type of soil the building was built on, clay. The land the structure was built on was slow
Gus Masoud
Feb 112 min read


Case Study - Shopping Mall
Project : 73,000 square foot shopping centre sunk up to 6”. Installer : Lève-Béton PURLIFT Challenge : The shopping mall was built in 2010 on a concrete structural 8” thick slab. A number of factors had contributed to the slabs having sunk, including one or more of the following: The type of soil the mall was built on, grey clay. The land the mall was built on used to be a marsh. Train tracks close by whereby the trains are travelling at a high speed and create .
Gus Masoud
Feb 111 min read
bottom of page